We haven’t
signed a contract yet, but we are close.
We met with
Sara, our designer, to review the initial contract and made a number of
changes. After contacting her
subcontractors she made the appropriate changes. She also came out with an HVAC guy to get a
quotation to add air conditioning to all 5 of the upstairs rooms.
I really need
to think of that as a separate project that’s being done in conjunction with
the remodel. But somehow my brain can’t
help but adding those two sums together.
We got the
revised contract. I still have some open
questions to Sara:
Sara:
A couple things:
11.1 I assume that the
"stairs" adder include removing the carpeting. What would
installing new carpeting cost?
11.1. I am having
a hard time getting my head around $5k for two closets. What other
options do we have?
11.1 AC. I assume
that the electrical all was adequate?
9.1, third bullet point
should reference the 7 windows, not 6
8.1 Let's discuss the
hardware. I don't recall what it looks like, but we may want to replace
it.
7.1. I assume
that includes removing any miscellaneous carpet remnants, tacks, etc.
Laurie and I will
discuss over the weekend. Looking forward to hearing back from you.
--Matt